Lenze PC-based Automation Industrial PC Manuale Utente Pagina 19

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 226
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 18
2.5 EN - 01/2012 L 19
Industrial PC | Parameter setting & configuration
Commissioning
4 Commissioning
This chapter provides general information on the first commissioning of an Industrial PC.
Depending on the actual hardware installed, different settings are required to integrate
the Industrial PC for machine control purposes into a network.
Further information on the setting of the IP address of your Industrial PC can be found in
the following section: Entering the IP address of the Industrial PC
( 32)
Note!
Please observe the following predefined IP addresses when commissioning
your IPC for the first time:
Engineering PC: 192.168.5.100
Industrial PC: 192.168.5.99
Read the Mounting Instructions accompanying the controller first before you start
working!
The Mounting Instructions contain safety instructions which must be observed!
Further information on the device-specific properties can be found in the
Hardware Manual of the corresponding Industrial PC.
Vedere la pagina 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 225 226

Commenti su questo manuale

Nessun commento