Opening the ApplicationTemplate PackML
32 Lenze · ApplicationTemplate PackML · 1.0 EN - 05/2014
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
7 Opening the ApplicationTemplate PackML
General procedure
The main steps are summarised in the following table:
The commissioning steps in detail
The following section provides a detailed description of every commissioning step.
Please follow the instructions below carefully to commission your automation system.
Step Activity
1st Create a new project - open the ApplicationTemplate PackML
( 33)
2nd Updating the controller in the project (optional)
( 34)
3rd Going online
( 34)
• Compiling the project data
( 34)
• Transferring the project to the control - "Log in"
( 34)
4th Downloading and starting the PLC program
( 34)
5th Getting started - operating the ApplicationTemplate PackML
( 35)
Further information on the parameter setting and configuration of the respective bus
system can be found in the communication manuals for the corresponding bus system: