Lenze EtherCAT Controller-based Automation Manuale Utente Pagina 91

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 205
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 90
Lenze · Controller-based Automation · EtherCAT® Communication Manual · DMS 6.4 EN · 04/2014 · TD17 91
7 Commissioning of the system
7.3 Detailed description of the commissioning steps
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
3. Select the DC functionality "DC for synchronization" in the device tree for the first slave (DC
master) under the master (Lenze Controller).
The first slave connected to the master must have DC capability.
If a slave does not support any distributed clocks, only "DC unused" can be selected here.
4. Also select the DC functionality "DC for synchronization" for all other slave devices which
are to use the DC synchronisation.
Vedere la pagina 90
1 2 ... 86 87 88 89 90 91 92 93 94 95 96 ... 204 205

Commenti su questo manuale

Nessun commento